The existing bells on the uncovered belfry have been fully exposed to the climate for nearly 20 years. The design intend is relocated the smaller bells into the existing church belltower and to provide a cover for the refurbished external bells. The design of the new belfry and the belltower is carried out on the basis of vibration tests. A confied spatial situation requires consideration whilst designing the belfry and developing the assembly strategy.